Kitchen Remodeling in the Triangle

A full kitchen remodel, from layout and cabinetry through to the final inspection, quoted fixed after a design and survey visit.

A kitchen mid-renovation with studs exposed on one wall, new cabinet boxes stacked and partly installed, and floor protection down

Is this an emergency?

No. Kitchen Remodeling is scheduled work and is not covered by our emergency service, which runs 24 hours, 7 days, including holidays. We will book you into an ordinary dispatch window rather than charge an emergency rate for a job that can wait for one.

About Kitchen Remodeling

How long it actually takes

Ten to twelve weeks from signature to a finished kitchen. That splits into three to five weeks of design and permitting, then four to seven weeks on site.

We lead with that because it is the number people are most often misled about. A kitchen is not a four-week job, and anyone quoting you four weeks total is either not pulling a permit or has not counted the design phase. You will be without a kitchen for the on-site portion, and you should plan for it: a microwave and a kettle somewhere else in the house, and a realistic view of takeaways.

The design and permit phase does not require you to move out or change anything. It is drawings, decisions and waiting for the county.

What it costs

Most Triangle kitchen remodels land between $24,000 and $95,000.

The bottom of that range is a same-layout refit: new cabinetry in the existing positions, new worktops, new splashback, new flooring, appliances reconnected where they already are. Nothing moves, so no drain, supply or gas relocation is needed, and the permit is straightforward.

The top is a full reconfiguration: a wall out, the sink and range relocated, custom cabinetry, stone worktops, a rebuilt electrical layout, and a structural beam where the wall used to be.

Kitchen remodels are financing eligible and clear the financing minimum many times over. Both lender options are on our financing page.

The five phases, and what happens in each

Phase one: design and selection, two to three weeks

We measure, produce drawings, and work through the decisions that set the price. Layout first, because everything else follows from it. Then cabinetry level, worktop material, tile, fixtures, flooring and paint.

This is the phase you control, and it is where nearly every delay we see originates. A client who arrives with layout preferences and a rough idea of finishes gets through it in two weeks. A client still choosing tile in week five has moved the finish date by three weeks and no amount of crew scheduling recovers it.

You get a fixed written quote at the end of this phase, with every allowance stated: what we have budgeted for cabinetry, tile, worktops and fixtures. Choose above an allowance and the difference is itemised. Choose below and you get the difference back.

Phase two: permit, one to two weeks

Submitted to the county once the drawings are fixed. Wake and Durham counties both run one to two weeks for a residential kitchen at the moment, longer after a storm event when the whole permit desk is loaded with roof work.

We cannot accelerate this and neither can anyone else. A contractor who offers to start before the permit is issued is offering to do unpermitted work, which becomes your problem when you sell the house.

Phase three: demolition and rough-in, one to two weeks

The old kitchen comes out and goes in a skip. We sheet the route from the door, seal the openings to the rest of the house, and run a negative air machine if we are cutting anything dusty.

Then the work behind the walls: structural first if a wall is coming out, then plumbing, electrical and any HVAC adjustment. This is where the surprises live, and there is nearly always one. On a house over thirty years old expect at least one of undersized wiring, a drain that was never properly vented, or a joist somebody notched for a pipe run decades ago.

Rough-in inspections happen at the end of this phase, before anything gets closed up. That is non-negotiable and it is the whole point of the permit.

Phase four: finishes, two to three weeks

Drywall, taping, and the first coat of paint. Then flooring, then cabinetry, then worktop templating.

Worktops are the timing constraint nobody expects. Stone worktops are templated after the cabinets are installed, not before, and fabrication takes one to two weeks after templating. That gap is real and it is in your programme. It is also why the splashback goes on after the worktop rather than before.

Then splashback tile, trim, final paint, fixtures, and appliance installation.

Phase five: inspection and handover, a few days

Final county inspection. Then we walk the kitchen with you and write a snag list. We fix the snag list before we ask for the final payment, not after.

What moves the price most

Whether the layout changes. This is the single biggest jump, larger than cabinetry level. Moving a sink means moving a drain, and a drain needs fall, which on a slab-on-grade house can mean cutting concrete. Keeping the wet wall where it is saves more money than any other decision available to you.

Cabinetry. Stock, semi-custom and fully custom vary by roughly a factor of three for the same run of units. This is the largest single line on most quotes.

Whether the wall is load bearing. People often assume it is not. In Triangle housing stock with roof trusses, an interior wall frequently is not structural, but plenty are, and the difference is a steel or engineered beam plus an engineer's stamp.

Your electrical panel. A modern kitchen needs more circuits than a 1980s one: separate small appliance circuits, a dedicated dishwasher circuit, a range circuit. If the panel is full, that is a panel upgrade, which is an electrical service quoted separately.

Appliances

You buy them, we install them. That is deliberate: it puts the manufacturer warranty in your name, it lets you shop the sales, and it means we are not marking up a fridge.

Tell us the models during the design phase, because appliance dimensions drive cabinetry dimensions. A counter-depth fridge specified in week six is a cabinet change, and a range with a different width than planned is a worktop change.

Living through it

Four to seven weeks without a kitchen is the real cost people underestimate.

We seal the work area, we sheet the route in and out, and we clean at the end of every day rather than at the end of the job. The dust still gets everywhere; anyone who tells you otherwise has not done this work. Take pictures off the walls in adjoining rooms.

Most clients set up a temporary kitchen in a dining room or garage: a microwave, a kettle, a toaster and the fridge if it can be moved. We will help you move the fridge.

What is included

Included
  • Design consultation, measured drawings and a fixed written quote
  • Permit application, inspection scheduling and meeting the inspector on site
  • Demolition and disposal of the existing kitchen
  • Structural work where a wall is removed, to an engineer's specification
  • Plumbing rough-in and final connection, including relocating sink and dishwasher services
  • Electrical rough-in, new circuits, and the receptacle count current code requires
  • HVAC adjustment where a register or return has to move
  • Drywall, taping and finishing
  • Cabinetry installation, stock through fully custom
  • Worktop templating and installation
  • Tile splashback and flooring
  • Painting and trim
  • Appliance installation for units you supply
Not included
  • Appliances themselves, which you buy so the warranty is in your name
  • Structural engineering stamps, which come from a licensed engineer
  • Asbestos and lead paint work, which requires an abatement contractor
  • Gas line replacement upstream of the appliance shutoff, which is a plumbing service
  • Electrical panel upgrades, which are an electrical service and quoted separately
  • Window and exterior door replacement
Brands serviced
KraftMaid, Wellborn, Shiloh, Cambria, Silestone, Delta, Kohler
Certifications
NC General Contractor licence 78341, EPA Lead-Safe certified firm
Permit required
Yes. We pull the permit, book the inspection and meet the inspector.
Typical timeline
Four to seven weeks on site, after a three to five week design and permit phase. Ten to twelve weeks from signature to a finished kitchen is realistic.

What it costs

This is quoted rather than booked. An estimate visit is free and carries no diagnostic fee, and you get a fixed written quote at the end of it. The range below is what work of this kind usually costs, not a quote.$24,000 to $95,000

After hours
$150 between and , and on Sundays
Financing
Available from $3,000This work clears the minimum. See financing options.

What moves the price

  • Whether the layout changes. Moving the sink or the range means moving drain, supply and gas, and that is the single biggest cost jump
  • Cabinetry. Stock, semi-custom and fully custom differ by a factor of three for the same run of units
  • Worktop material, where quartz and natural stone sit well above laminate and butcher block
  • Whether a wall is coming out, and whether it turns out to be load bearing
  • What the electrical panel can take, since a modern kitchen needs circuits a 1980s panel does not have
  • Appliance specification, which you buy and we install
What affects any Cedarline price
  • How old the equipment is, and whether replacement parts are still manufactured
  • How accessible the work area is: a crawlspace or a second-storey roof takes longer than a garage
  • Whether a permit and an inspection are required
  • Material grade, which on a roof or a deck moves the total more than labour does
  • Whether the visit falls outside dispatch hours

Before we arrive

  • Clear the worktops so the existing runs can be measured
  • Gather any photographs of layouts you like, which shortens the design phase more than anything else
  • Find the electrical panel and take a photograph of the label
  • Note whether the house has ever had a kitchen leak, and where

Typical timeline

Four to seven weeks on site, after a three to five week design and permit phase. Ten to twelve weeks from signature to a finished kitchen is realistic.

Warranty

Labour
24 months
Parts
12 months

Two years on our workmanship. Cabinetry, worktops and fixtures carry their manufacturer warranties separately, which we register and hand over at completion.

Questions

Remodeling and construction questions

How long does a kitchen remodel take?

Ten to twelve weeks from signature to a finished kitchen: three to five weeks of design and permitting, then four to seven weeks on site. Anyone quoting four weeks in total is either not pulling a permit or has not counted the design phase. You are without a kitchen for the on-site portion, so plan a temporary setup with a microwave and a kettle somewhere else in the house.

Why can I not get a price over the phone?

Because a remodel price depends on what is behind your walls, what the county will permit, what you choose to put back, and how much of the existing structure is worth keeping. Two identical-looking 1990s kitchens in Cary can differ by tens of thousands once the cabinets come off. Every project starts with a free design and survey visit that produces a fixed written quote with every allowance stated.

What is an allowance in a quote?

An allowance is the sum we have budgeted for something you have not chosen yet, such as tile, fixtures or cabinetry. Every quote states its allowances plainly. Choose above one and the difference is itemised; choose below it and you get the difference back. Quotes without stated allowances are how a fixed price turns into a moving one.

What makes one remodel cost more than another?

Whether the layout changes, more than anything else. Moving a sink means moving a drain, and a drain needs fall, which on a slab-on-grade house can mean cutting concrete. Keeping the wet wall where it is saves more money than any other decision available to you. After that it is cabinetry level, whether a wall is load bearing, and whether your electrical panel can carry a modern kitchen.

Can you start before the permit comes through?

No. A contractor who offers to start before the permit is issued is offering to do unpermitted work, which becomes your problem when you sell the house. Wake and Durham counties both run one to two weeks for a residential kitchen at present, longer after a storm event when the permit desk is loaded with roof work. We pull the permit, book the inspections, and meet the inspector on site.

Can I live in the house during the work?

For most projects yes, and most clients do. On an addition the majority of the work happens outside your walls, with two disruptive phases: excavation week, when you lose the driveway, and the tie-in, when we open the existing exterior wall. On a kitchen or bathroom you lose that room for the on-site phase. Water and power stay on throughout, with brief planned interruptions we tell you about the day before.

Can I build an addition anywhere on my lot?

No, and three site constraints decide what is buildable. Setbacks are required distances from every boundary, and in much of Wake and Durham County the side setback is the binding one, which frequently pushes an addition to the back rather than the side you wanted. Lot coverage caps the proportion of the lot under roof and hard standing, and an existing patio counts toward it. Utility and drainage easements cannot be built over at all. All three are on your plot survey.

Do I need HOA approval?

In most Triangle subdivisions, yes, for anything visible from the street or from a neighbour. The architectural review committee meets on its own schedule and it is frequently the single longest wait in an addition project, so start it early. We prepare and submit the package, but we cannot make the committee meet sooner.

Can you just finish my basement without dealing with the damp?

No. Framing over a moisture problem is the most expensive mistake in basement finishing, because drywall and insulation in a below-grade room that takes water is not a room that needs repair later, it is a room that has to be demolished and rebuilt. We assess moisture first and put the findings in writing before anything is designed. Sometimes the answer is nothing at all, because plenty of Triangle basements are genuinely dry.

Can I put a bedroom in my basement?

Only if it has a compliant egress window: minimum opening size, maximum sill height, and a window well big enough to climb out of. In a poured or block foundation that means cutting and shoring the wall and excavating outside, and it is one of the larger single line items on a basement quote. Without it the room can be an office or a den, but it cannot be called a bedroom, and calling it one anyway causes problems at sale.

Am I allowed to convert my garage?

Not always, and it is worth checking before you pay for drawings. Some Triangle subdivisions restrict garage conversions outright through HOA covenants, and some counties require a minimum number of off-street or covered parking spaces per dwelling, which losing your garage can put you below. If the plan involves its own entrance, kitchen and bathroom, that is an accessory dwelling unit rather than a conversion, with different rules that in much of the Triangle do not permit it.

When do I need a structural engineer?

Whenever a project removes or alters a load-bearing element, and for most structural repair work. The engineer writes the specification and we build to it, which matters because a contractor who diagnoses a structural problem and then sells you the repair has an obvious conflict of interest. We coordinate the engineer, their fee is separate and paid to them directly so nobody is marking it up, and you get both documents.

I have a crack in my foundation. Is it urgent?

Usually not, but the way to find out is to measure it rather than guess. Draw a pencil line across each end of the crack, write the date beside it, and photograph it with a coin for scale. A crack that has not moved in three months is very different from one that has moved in three weeks. Most Triangle cracking is historic, because clay soils swell and shrink seasonally and a great many cracks opened years ago and stopped. What does need attention is horizontal cracking, stair-step cracking in block, and anything actively widening.

Common questions

How long is the arrival window?

Most visits carry a two hour arrival window, and roofing and construction visits carry three. We quote a window rather than an exact time because a trades crew genuinely cannot promise a minute, and we would rather be accurate than optimistic. We text you when the crew is on the way.

Is the diagnostic fee waived if I go ahead with the repair?

Yes. The diagnostic fee covers the technician's time and a written fault report, and it is waived when you approve the repair. Installation and replacement quotes carry no diagnostic fee at all, because nothing is being diagnosed on an estimate visit.

Is a slot confirmed as soon as I request it?

Not quite. A request is not a held slot. We confirm within 30 minutes during dispatch hours, and first thing the next dispatch day if you request outside them. The availability shown on the site reflects how full a day usually is rather than a live view of the dispatch board.

How can I pay?

We accept Visa, Mastercard, American Express, Discover, ACH bank transfer, and financing on qualifying projects. Payment is due on completion for service work, and on a staged schedule set out in the quote for larger projects. There are two payment methods we cannot take, which are covered in our billing questions.

What happens if I need to cancel?

Give us 24 hours notice and there is no charge. One call or one text is enough to reschedule, and we would much rather move you than charge you. Cancelling inside that window, or nobody being home when the crew arrives, carries a no-show fee.

What happens if nobody is home when the crew arrives?

There is a no-show fee, and it is the same figure as the late cancellation fee. It covers the slot another customer could have used and the crew's drive. If you are running late rather than absent, call us and we will usually wait or come back later the same day at no charge.

What actually happens on a service call?

A technician arrives inside the arrival window, diagnoses the fault, tells you the repair price before touching anything, and completes the work if you approve it. You get a written report either way. Nothing is added to the invoice without your approval first, and we do not carry out extra work while you are out of the room.

What are your hours?

The office is open Monday to Friday from 07:30, and Saturday mornings. Crews dispatch on a wider window, from 07:00 to 19:00 on weekdays and 08:00 to 16:00 on Saturday. There is no scheduled dispatch on Sunday. Emergency coverage runs 24 hours a day, every day, including holidays.

Do you cover my area?

We cover Raleigh, Durham, Cary and the wider Triangle, with coverage recorded city by city because it is not uniform. Most cities have every trade and no travel fee, two have a limited set of trades and a travel fee, one is emergency coverage only, and some adjacent zip codes are outside the service radius entirely. Enter your zip code on our service areas page for a definitive answer.

Do you work on commercial buildings?

No. We are residential only, including multifamily buildings up to four units. A four-unit building is the ceiling and it is a real one rather than a preference: our crews, our insurance and our licences are all sized for residential work. For anything larger, or for any commercial or industrial property, you need a commercial general contractor.

Do you install pool heaters, septic systems, or solar?

No to all three, and we will point you at the right trade for each. Pool and spa equipment sits under a separate licence, so you need a pool service company. Septic systems need a licensed septic contractor, and Wake County keeps a list of permitted installers. Solar needs a solar installer, though we will happily reroof around an existing array. We publish the full list of work we do not take on rather than making you ask.

Do you have Spanish-speaking technicians?

Yes, Monday through Friday. We do not staff Spanish-speaking crews at weekends. If you need one, ask when you book and we will schedule you on a weekday rather than send someone who cannot explain the work to you.

Are you licensed and insured?

Yes. We hold five North Carolina licences covering HVAC, general contracting, roofing, plumbing and electrical, and every licence number is published on our site rather than available on request. We carry general liability cover and workers compensation cover, and we are bonded. Certificates go to your adjuster or your HOA the same day you ask.

What warranty do you give?

Twelve months on labour and parts is the standard, and several services carry considerably longer. Roof replacements carry ten years on workmanship, repiping ten years, structural repair five years, and cabinetry five years. Manufacturer warranties on equipment run separately and are often longer still, and we register them in your name before we leave.

What if I am not happy with the work?

We come back and put it right at no charge. There is no time limit on a workmanship complaint about a repair we performed. Call the office rather than the crew directly, so it gets logged and scheduled rather than depending on one person remembering.

What should I do with my pets?

Secure them away from the work area before we arrive. This is genuinely for their safety rather than ours: crews prop doors open, carry sharp and heavy things through the house, and use tools that frighten animals. Tell us when you book if you have a dog that needs handling carefully, and we will note it on the job.

Do I need to be home?

For most visits, no, provided we can get in and reach the work. Inspections, maintenance visits and outdoor work frequently happen with nobody home. You do need to be there for anything where we will be quoting work, making decisions with you, or entering occupied rooms. We will tell you which yours is when you book.

What access do you need?

A clear path to the work area, clear parking for a van near the house, and unlocked side gates where the job is round the back. Roofing and outdoor work need the driveway, sometimes for a skip. If parking is difficult where you are, tell us when you book, because a crew circling for twenty minutes is time on your job.

What is the difference between emergency and scheduled work?

Two separate operations with separate rules. Scheduled work runs inside published dispatch hours, is booked into an arrival window, and carries the ordinary diagnostic fee. Emergency work runs around the clock on a fixed shortlist of eight services, targets a 90 minute response, and carries a call-out fee on top. Ringing the emergency line about something outside that shortlist does not upgrade it; you get booked into the next ordinary window instead. Our emergency questions list exactly which eight services qualify and set out what to do while you wait.

How long is a written quote valid?

Thirty days from the date on it. Beyond that we will re-price rather than honour a figure that no longer covers the materials, and material prices on roofing and lumber in particular move enough that a quarter-old quote is not meaningful. Re-pricing an expired quote is quick, because the survey work is already done.

Is a maintenance plan worth it?

It depends on how much work you expect to need. The plans bundle seasonal visits with priority dispatch and a standing discount on repairs, billed monthly, and the discount alone pays for the cheapest tier if you have one significant repair a year. If you rarely call anyone out, paying per visit is the better arithmetic and we will say so.

Is Cedarline Home Services a real company?

No. Cedarline Home Services is a fictional company used for demos. Every price, policy, licence number and phone number on this site is invented for that purpose, and none of it should be relied on as a real quotation or a real business record.

Billing, financing and insurance questions

Do you take personal cheques?

No, and we cannot take cash payments above $500 either. Both limits are firm and they apply to every job regardless of size. Everything else is open to you: Visa, Mastercard, American Express, Discover, ACH bank transfer, and financing on qualifying projects. If neither of those excluded methods being unavailable works for you, tell us before the crew arrives rather than at the door.

Is the diagnostic fee refundable if I decline the repair?

No. The diagnostic fee is not refundable, and it is a distinct thing from being waived. If you approve the repair, the fee is waived and does not appear on your invoice. If you decline, the fee is what you pay and it is all you pay, and the written fault report is yours to keep and to take to another contractor for a second quote. You are paying for the diagnosis and the report, and you receive both either way.

Can I get financing on a repair?

Only if the total is $3,000 or above, which most repairs are not. Financing starts at $3,000 and below that neither lender will write the paper, so a service call, a tune-up, an inspection or a diagnostic visit cannot be financed at any price. It applies to installation, replacement, remodeling, additions, roof replacement, and panel upgrades and generator installation. If your repair comes in under the minimum, the card and ACH options are the practical route.

What financing terms do you offer?

Two options through two lenders: 0% APR over 12 months, and 6.99% APR fixed over 60 months. The 0% offer is genuinely 0% if you clear the balance inside 12 months, but if a balance remains after month 12, interest is charged from the original purchase date rather than from month 13. That is how deferred-interest financing works everywhere and it is worth knowing before you choose it. The 60 month option is a plain fixed-rate loan with no early settlement penalty.

Does applying for financing affect my credit score?

No. The application runs a soft credit check, which does not affect your score, and it returns a decision in minutes. You can apply before you commit to the work, so the monthly figure is part of the decision rather than something you work out afterwards. Bring the quote reference and a photo ID; we can do the application with you at the kitchen table or over the phone.

When is payment due?

On completion for service work, and on a staged schedule set out in the quote for larger projects. We do not ask for payment before work starts on a service call. On a project, the stages are written into the quote before you sign, and the final payment is due after the snag list is cleared rather than before it, so you are never paying for work that is not finished.

Are permit fees included in the quote?

They are passed through at cost and itemised separately on your invoice, so you can see what went to the county and what came to us. We pull the permit, book the inspection and meet the inspector on site as part of the work. We do not mark permit fees up.

Will you handle my insurance claim for me?

No, and be careful of anyone who says they will. We are not public adjusters and we are not licensed to act for you in a claim. What we do is document the damage properly, meet your adjuster on the roof, answer technical questions about what failed and why, and carry out the work your insurer approves. The claim itself stays between you and your insurer. If you want somebody to argue the claim for you, hire a licensed public adjuster, which is a real and regulated profession in North Carolina.

Can you waive my insurance deductible?

No. Your deductible is yours to pay and it is due to us on completion. We will not absorb it, discount it, or inflate the scope to cover it. Contractors who offer to waive your deductible are committing insurance fraud and exposing you to it too, because the homeowner signs the claim, and it is straightforwardly illegal in North Carolina. If the approved scope comes in below your deductible there is no point claiming at all, and we will say so.

Why did my insurer only pay part of the settlement?

Most policies here settle on a replacement cost basis in two payments: an initial actual cash value payment, then the recoverable depreciation once the work is complete and invoiced. That second payment is why the paperwork at the end matters as much as the paperwork at the start. We provide the final invoice and completion documentation your insurer needs to release it, and financing can bridge the gap between starting the work and the depreciation arriving.

Will my insurance cover structural damage?

It depends on whether the cause was sudden or gradual, and structural claims are refused more often than any other kind we see. Standard policies generally cover a sudden event: a tree through the roof, a vehicle into the wall, a burst pipe that soaked the framing over a weekend. They generally exclude gradual causes: long-term water ingress, rot, termites, settlement and earth movement. Most of what we find in Triangle crawlspaces falls in the second category, and filing anyway usually produces a denial that sits on your claims history.

Should I sign an assignment of benefits?

Read it very carefully and consider not signing. It hands the contractor the right to deal with your insurer directly and to be paid directly, and it can leave you liable for the difference if the claim settles low. We never ask for one. After a significant hail event, out-of-state crews arrive, knock doors and press for a signature that day, and this is one of the documents they press for.

How is a maintenance plan billed, and can I cancel?

Billed monthly by card or ACH, and you can cancel any time with 30 days notice, with no exit fee. Visits already delivered in the plan year are not refunded. There is no minimum term and no automatic price escalation written into the plan.

How to get a price

A kitchen remodel is designed before it is priced. The layout, the cabinetry level, the worktop, whether a wall is load bearing and what your electrical panel can carry all move the total by tens of thousands, and none of it can be assessed from an address. Book a free design and survey visit and you will have a fixed written quote with every allowance stated.